Peritas were engaged by Process 26 to integrate the structural elements of a 500,000 tpa gravity gold circuit into an existing Ni-Cu flotation plant.
The scope included maximizing the reuse of existing equipment. In conjunction with Artemis, a process flow diagram and mass balance were developed for the integrated gold circuit. Peritas performed all civil & structural, engineering for the gravity circuit integration.
Onsite activities consisted of the following:
- Installation of all concrete and civil works
- Refurbishment of primary and secondary crushing station
- Integration of a new Metso HP200 tertiary crusher
- Structural audit & repairs to existing plant in accordance with DMIRSrequirements
- Replacement of RE Wall with mass retaining wall
- Refurbishment of existing mills
- Supply and installation of DSM screen and cyclones for mill classification
- Supply and installation of gravity circuit feed conveyors
- Supply and installation of gold room and security system
- Redesign and refurbishment of HV Electrical distribution network
- Refurbishment of LV electrical reticulation system
- Upgrade of SCADA system
- Relocation and installation of new 10m tails thickener
- Raw water dam refurbishment
- Air and water system upgrade