Modular Iron Ore Handling Plant – Peritas
Skip to content
Home / Projects / Modular Iron Ore Handling Plant

Bayshore Estate

Expertise Structural Engineering design, documentation and site supervision and Bulk Material Handling.

Location Yarrie, Pilbara WA

Project Notes

Peritas work included:

  • Iron ore plant required consideration of assembly, disassembly, and transport between BHPs smaller mine deposits.
  • Modularised to standard road transport constraints.
  • Static, dynamic and fatigue analysis and design to BHP Standard.
  • Design calculations and documentation to BHP Standard.
  • Utilised extensive in house mining and bulk materials handling expertise.