Modular Iron Ore Handling Plant - Peritas
Skip to content
Home / Projects / Modular Iron Ore Handling Plant

Modular Iron Ore Handling Plant

Expertise Structural Engineering design, documentation, site supervision and bulk material handling

Location Pilbara, WA

Project Notes

Peritas work included:

  • Iron ore plant required consideration of assembly, disassembly, and transport between BHPs smaller mine deposits.
  • Modularised to standard road transport constraints.
  • Static, dynamic and fatigue analysis and design to BHP Standard.
  • Design calculations and documentation to BHP Standard.
  • Utilised extensive in house mining and bulk materials handling expertise.

contact us

PERTH OFFICE

+61 8 6336 9299

enquiries@peritasgroup.com.au

74 Goodwood Parade, Burswood WA 6100

MELBOURNE OFFICE

+61 3 8657 9292

enquiries@peritasgroup.com.au

Two Melbourne Quarter, Suite 307, 697 Collins St, Docklands VIC 3008

BRISBANE OFFICE

+ 61 7 3074 0157

enquiries@peritasgroup.com.au

Level 1, 470 St Pauls Tce, Fortitude Valley, QLD 4006

have a project you'd like to discuss? get in touch.